Message type: E = Error
Message class: /SAPAPO/OM_ERROR -
Message number: 289
Message text: Calendar resource cannot yet be used
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
/SAPAPO/OM_ERROR289
- Calendar resource cannot yet be used ?The SAP error message /SAPAPO/OM_ERROR289 indicates that a calendar resource cannot yet be used in the context of Advanced Planning and Optimization (APO). This error typically arises when there is an issue with the configuration or availability of the calendar resource that is being referenced in a planning scenario.
Cause: Calendar Not Active: The calendar resource may not be activated or is not yet available for the planning period you are trying to use it for. Incorrect Configuration: The calendar may not be properly configured in the system, leading to it being unavailable for the required operations. Time Period Issues: The time period for which the resource is being requested may not align with the active periods defined in the calendar. Resource Status: The resource may be in a status that does not allow it to be used (e.g., it may be marked as inactive).
Solution: Check Calendar Activation: Ensure that the calendar resource is activated for
Get instant SAP help. Sign up for our Free Essentials Plan.
/SAPAPO/OM_ERROR288
Pegging area already marked for deletion
INCLUDE /SAPAPO/OM_ERROR_GENERAL OBJECT DOKU ID TXError message extract from SAP system. Copyright SAP SE. ...
/SAPAPO/OM_ERROR285
Invalid conversion factor for storage quantity
INCLUDE /SAPAPO/OM_ERROR_GENERAL OBJECT DOKU ID TXError message extract from SAP system. Copyright SAP SE. ...
/SAPAPO/OM_ERROR290
Invalid /SAPAPO/OM_GET_PRIM_RES value
INCLUDE /SAPAPO/OM_ERROR_GENERAL OBJECT DOKU ID TXError message extract from SAP system. Copyright SAP SE. ...
/SAPAPO/OM_ERROR291
Invalid change
What causes this issue? An application program called a COM routine which led to this error. The capacity requirements must be changed in the same wa...
Click on this link to search all SAP messages.