Message type: E = Error
Message class: /SAPAPO/OM_ERROR -
Message number: 240
Message text: Simulations not allowed when using scheduling agreements
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
/SAPAPO/OM_ERROR240
- Simulations not allowed when using scheduling agreements ?The SAP error message /SAPAPO/OM_ERROR240 indicates that simulations are not allowed when using scheduling agreements in the Advanced Planning and Optimization (APO) module of SAP. This error typically arises when a user attempts to run a simulation for a planning scenario that involves scheduling agreements, which are contracts between a supplier and a customer that outline the terms of delivery over a specified period.
Cause: The primary cause of this error is that the system does not support simulation runs for planning scenarios that include scheduling agreements. This restriction is in place because scheduling agreements involve specific contractual obligations and conditions that cannot be altered or simulated without affecting the underlying agreements.
Solution: To resolve this error, you can consider the following approaches: Use Standard Planning: Instead of running a simulation, execute the standard planning process. This will allow you to work with the scheduling agreements as intended without triggering the error. Check Planning Parameters: Review
Get instant SAP help. Sign up for our Free Essentials Plan.
/SAPAPO/OM_ERROR239
An edge of this type does not exist between the two I/O nodes
INCLUDE /SAPAPO/OM_ERROR_GENERAL OBJECT DOKU ID TXError message extract from SAP system. Copyright SAP SE. ...
/SAPAPO/OM_ERROR238
An edge of this type already exists between the two I/O nodes
INCLUDE /SAPAPO/OM_ERROR_GENERAL OBJECT DOKU ID TXError message extract from SAP system. Copyright SAP SE. ...
/SAPAPO/OM_ERROR241
Invalid value for OM_HAS_CHARACTS
INCLUDE /SAPAPO/OM_ERROR_GENERAL OBJECT DOKU ID TXError message extract from SAP system. Copyright SAP SE. ...
/SAPAPO/OM_ERROR242
Inconsistent times for a constraint
INCLUDE /SAPAPO/OM_ERROR_GENERAL OBJECT DOKU ID TXError message extract from SAP system. Copyright SAP SE. ...
Click on this link to search all SAP messages.