Message type: E = Error
Message class: /SAPAPO/OM_ERROR -
Message number: 197
Message text: SNP activities require complete scheduler specifications
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
/SAPAPO/OM_ERROR197
- SNP activities require complete scheduler specifications ?The SAP error message
/SAPAPO/OM_ERROR197
indicates that there is an issue with the scheduling specifications for SNP (Supply Network Planning) activities in SAP APO (Advanced Planning and Optimization). This error typically arises when the system requires complete and valid scheduling specifications for the SNP activities to be executed properly.Cause:
The error can occur due to several reasons:
- Incomplete Scheduler Specifications: The scheduling parameters for the SNP activities are not fully defined. This could include missing details such as start and end dates, time buckets, or other necessary parameters.
- Configuration Issues: There may be issues with the configuration of the SNP planning area or the planning book that is being used.
- Master Data Issues: Missing or incorrect master data (like product master, location master, etc.) can lead to incomplete scheduling specifications.
- Planning Version Issues: The planning version being used may not be properly set up or may not have the necessary data.
Solution:
To resolve this error, you can take the following steps:
Check Scheduler Specifications:
- Go to the SNP planning book and check the scheduler specifications. Ensure that all required fields are filled out correctly.
- Verify that the time buckets and planning horizons are correctly defined.
Review Configuration:
- Check the configuration of the SNP planning area. Ensure that all necessary settings are in place and that the planning area is activated.
- Review the settings in the SNP profile to ensure they are correctly configured.
Validate Master Data:
- Ensure that all relevant master data is complete and accurate. This includes checking the product master, location master, and any other relevant data.
- Make sure that the products involved in the SNP activities are correctly defined and have the necessary data.
Check Planning Version:
- Ensure that the planning version you are using is correctly set up and contains all the necessary data for the SNP activities.
- If necessary, create a new planning version or copy an existing one to ensure it has the correct settings.
Consult Documentation:
- Refer to SAP documentation or help resources for more detailed information on the specific requirements for SNP scheduling specifications.
Contact SAP Support:
- If the issue persists after checking the above points, consider reaching out to SAP support for further assistance. They may provide insights specific to your system configuration.
Related Information:
/SAPAPO/SDP94
(SNP Planning Book) or /SAPAPO/OM01
(SNP Planning Area) to access relevant settings.By following these steps, you should be able to identify and resolve the cause of the error message /SAPAPO/OM_ERROR197
.
Get instant SAP help. Start your 7-day free trial now.
/SAPAPO/OM_ERROR196
This resource may not be used as a secondary resource
What causes this issue? An application program called an LCA routine. This led to an error. Technical information: A resource that shall be used as a...
/SAPAPO/OM_ERROR195
An isolated constraint was found
INCLUDE /SAPAPO/OM_ERROR_GENERAL OBJECT DOKU ID TXError message extract from SAP system. Copyright SAP SE. ...
/SAPAPO/OM_ERROR198
Negative processing time not allowed for scheduling
INCLUDE /SAPAPO/OM_ERROR_GENERAL OBJECT DOKU ID TX LANGUAGE ENError message extract from SAP system. Copyright SAP SE. ...
/SAPAPO/OM_ERROR199
Confirmations may not be made to SNP activities
INCLUDE /SAPAPO/OM_ERROR_GENERAL OBJECT DOKU ID TXError message extract from SAP system. Copyright SAP SE. ...