Message type: E = Error
Message class: /SAPAPO/OM_ERROR -
Message number: 149
Message text: A setup activity may not cover a secondary resource
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
/SAPAPO/OM_ERROR149
- A setup activity may not cover a secondary resource ?The SAP error message /SAPAPO/OM_ERROR149 indicates that there is an issue with the setup activities in the Advanced Planning and Optimization (APO) module, specifically related to the configuration of resources and their associated setup activities. The error message states that a setup activity may not cover a secondary resource, which typically means that the setup activity defined for a primary resource is not applicable or is incorrectly configured for a secondary resource.
Cause: Resource Configuration: The primary resource may have a setup activity defined, but the secondary resource does not have a corresponding setup activity or the setup activity is not correctly linked to the secondary resource. Incorrect Assignment: The setup activity might be assigned to the wrong resource or not assigned at all to the secondary resource. Resource Type Mismatch: The setup activity may be defined for a different type of resource than the one being used in the planning process. Planning Version Issues:
Get instant SAP help. Sign up for our Free Essentials Plan.
/SAPAPO/OM_ERROR148
Cover flag was assigned for a secondary resource
INCLUDE /SAPAPO/OM_ERROR_GENERAL OBJECT DOKU ID TXError message extract from SAP system. Copyright SAP SE. ...
/SAPAPO/OM_ERROR147
Invalid time entry for scheduler at activity
INCLUDE /SAPAPO/OM_ERROR_GENERAL OBJECT DOKU ID TXError message extract from SAP system. Copyright SAP SE. ...
/SAPAPO/OM_ERROR153
Invalid characteristics container
What causes this issue? An application program called a COM routine. This led to the following error: A characteristics container only exists in the ...
/SAPAPO/OM_ERROR154
A characteristics container with this GUID already exists in liveCache
INCLUDE /SAPAPO/OM_ERROR_GENERAL OBJECT DOKU ID TXError message extract from SAP system. Copyright SAP SE. ...
Click on this link to search all SAP messages.