Message type: E = Error
Message class: /SAPAPO/OM -
Message number: 149
Message text: Scheduling direction of activities not clear
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
/SAPAPO/OM149
- Scheduling direction of activities not clear ?The SAP error message /SAPAPO/OM149 indicates that there is an issue with the scheduling direction of activities in the Advanced Planning and Optimization (APO) module. This error typically arises when the system cannot determine the correct scheduling direction for a set of activities, which can occur due to various reasons. Causes: Missing or Incorrect Activity Relationships: If the relationships between activities (predecessors and successors) are not defined correctly, the system may not be able to determine how to schedule them. Inconsistent Data: Inconsistencies in the master data, such as incorrect lead times or durations, can lead to ambiguity in scheduling.
Configuration Issues: Incorrect configuration settings in the APO system can also lead to this error. Resource Constraints: If there are constraints on resources that are not properly defined, the system may struggle to determine the scheduling direction. Planning Version Issues: If the planning version is not set up correctly or if there are issues with the
Get instant SAP help. Sign up for our Free Essentials Plan.
/SAPAPO/OM126
Negative stock quantity
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
/SAPAPO/OM125
Date/time was changed
What causes this issue? Some dates/times and dependent values (for example, whether an activity takes place during working time) were changed. This o...
/SAPAPO/OM150
Upgrade was not prepared
What causes this issue? You have not yet executed the "Prepare Upgrade" menu option. This must be done before an upgrade to a new release, ...
/SAPAPO/OM151
The LCAPPS version is too old.
What causes this issue? The LCAPPS version Build &V1& Patchlevel &V2& is too old. You need at minimum version Build &V3& Patc...
Click on this link to search all SAP messages.