How To Fix /SAPAPO/OM069 - Invalid scheduling direction


/SAPAPO/OM069 - Overview

  • Message type: E = Error

  • Message class: /SAPAPO/OM -

  • Message number: 069

  • Message text: Invalid scheduling direction

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message /SAPAPO/OM069 - Invalid scheduling direction ?
    The SAP error message /SAPAPO/OM069 Invalid scheduling direction typically occurs in the context of Advanced Planning and Optimization (APO) when there is an issue with the scheduling direction of a production or planning order. This error indicates that the system is unable to determine a valid scheduling direction for the operation or activity being processed.
    Causes:
    
    Incorrect Configuration: The scheduling direction may not be properly configured in the APO system. This can happen if the settings for the production process or the planning parameters are not aligned.
    Invalid Data: The data associated with the order or operation may be incomplete or incorrect, leading to an inability to determine the scheduling direction.
    Master Data Issues: Problems with master data, such as the material master, resource master, or production version, can also lead to this error.
    Planning Version Issues: The planning version being used may not be set up correctly or may not have the necessary data

    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo simplifies finding the accurate answers to SAP message errors. I now use every week. A must have tool for anyone working with SAP! Highly recommended!
Rate 1
Kent Bettisworth
Executive SAP Consultant