How To Fix /SAPAPO/ND323 - Solution not optimal because maximum runtime exceeded


/SAPAPO/ND323 - Overview

  • Message type: E = Error

  • Message class: /SAPAPO/ND -

  • Message number: 323

  • Message text: Solution not optimal because maximum runtime exceeded

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message /SAPAPO/ND323 - Solution not optimal because maximum runtime exceeded ?
    The SAP error message /SAPAPO/ND323 Solution not optimal because maximum runtime exceeded typically occurs in the context of SAP Advanced Planning and Optimization (APO) when a planning run (such as a heuristic or optimization run) takes longer than the predefined maximum runtime. This can happen for various reasons, including complex planning scenarios, large datasets, or inefficient algorithms.
    Causes:
    
    Complexity of the Problem: The planning problem may be too complex, involving many constraints or a large number of products, which can lead to longer processing times.
    Large Data Volume: A significant amount of data (e.g., many products, locations, or time periods) can increase the runtime of the planning process.
    Inefficient Heuristics or Algorithms: The selected heuristic or optimization algorithm may not be suitable for the specific planning scenario, leading to longer processing times.
    System Performance: Insufficient system resources (CPU, memory) or performance issues can also contribute to longer runtimes.
    Configuration Settings: The maximum runtime setting may be

    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo's SAP support assistant is amazing. Saves me countless hours trying to solve complex SAP issues myself. It's a real game changer!
Rate 1
Thomas Michael
SAP Consultant, Author & Speaker