How To Fix /SAPAPO/ND169 - No production resources available in &1


SAP Error Message - Details

  • Message type: E = Error

  • Message class: /SAPAPO/ND -

  • Message number: 169

  • Message text: No production resources available in &1

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message /SAPAPO/ND169 - No production resources available in &1 ?

    The SAP error message /SAPAPO/ND169 No production resources available in &1 typically occurs in the context of Advanced Planning and Optimization (APO) when there are no available production resources (like machines or work centers) for a specific product or production order in the specified location or plant.

    Cause:

    1. Resource Capacity Issues: The production resources may be fully booked or have insufficient capacity to handle the planned production.
    2. Resource Availability: The resources may be marked as unavailable due to maintenance, breakdowns, or other reasons.
    3. Incorrect Planning Parameters: The planning parameters for the product or resource may not be set correctly, leading to a mismatch in availability.
    4. Master Data Issues: There may be issues with the master data configuration for the resources, such as incorrect settings in the resource or product master records.
    5. Time Period: The planning horizon may not include the time period when the production is supposed to occur, leading to no available resources being found.

    Solution:

    1. Check Resource Availability: Verify the availability of the production resources in the specified plant. Check for any maintenance schedules or downtimes that may affect availability.
    2. Adjust Capacity: If resources are fully booked, consider adjusting the production schedule or increasing the capacity of the resources if possible.
    3. Review Planning Parameters: Ensure that the planning parameters for the product and resources are correctly set. This includes lead times, production times, and any constraints that may affect resource allocation.
    4. Update Master Data: Review and update the master data for the resources and products involved. Ensure that all relevant fields are correctly filled out and that there are no inconsistencies.
    5. Check Time Period: Make sure that the planning horizon includes the time period for which the production is being planned. Adjust the planning settings if necessary.
    6. Run Heuristic or Optimization: If applicable, run the planning heuristic or optimization process again to see if it can allocate resources more effectively.

    Related Information:

    • Transaction Codes: You may want to use transaction codes like /SAPAPO/MC90 (to check resource availability) or /SAPAPO/SDP94 (to analyze the supply and demand situation).
    • SAP Notes: Check for any relevant SAP Notes that may address specific issues related to this error message.
    • Documentation: Refer to SAP documentation for APO regarding resource planning and capacity management for more detailed guidance.

    If the issue persists after checking these areas, it may be beneficial to consult with your SAP support team or a functional consultant who specializes in APO for further investigation.

    • Do you have any question about this error?


      Upgrade now to chat with this error.


Instant HelpGet instant SAP help. Start your 7-day free trial now.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo simplifies finding the accurate answers to SAP message errors. I now use every week. A must have tool for anyone working with SAP! Highly recommended!
Rate 1
Kent Bettisworth
Executive SAP Consultant