How To Fix /SAPAPO/ND106 - In order to define calendar, a resource must be entered in PPM &1


/SAPAPO/ND106 - Overview

  • Message type: E = Error

  • Message class: /SAPAPO/ND -

  • Message number: 106

  • Message text: In order to define calendar, a resource must be entered in PPM &1

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message /SAPAPO/ND106 - In order to define calendar, a resource must be entered in PPM &1 ?
    The SAP error message /SAPAPO/ND106 indicates that a resource must be defined in the Production Planning and Detailed Scheduling (PP/DS) area before you can define a calendar for that resource. This error typically occurs when you are trying to create or modify a calendar in the Advanced Planning and Optimization (APO) module without having a corresponding resource defined in the system.
    
    Cause: Missing Resource Definition: The primary cause of this error is that the resource you are trying to associate with a calendar has not been defined in the system. Incorrect Resource Assignment: The resource may not be correctly assigned in the relevant planning area or may not exist in the system. Data Inconsistency: There may be inconsistencies in the data that prevent the system from recognizing the resource.
    Solution: To resolve this error, follow these steps: Check Resource Definition: Go to the transaction code /SAPAPO/RES01 (Resource Overview) or /SAPAPO/RES02 (Resource Maintenance). Verify that the resource you are trying

    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo simplifies finding the accurate answers to SAP message errors. I now use every week. A must have tool for anyone working with SAP! Highly recommended!
Rate 1
Kent Bettisworth
Executive SAP Consultant