How To Fix /SAPAPO/MSDP_REL004 - Scheduling logic not valid: &1


/SAPAPO/MSDP_REL004 - Overview

  • Message type: E = Error

  • Message class: /SAPAPO/MSDP_REL -

  • Message number: 004

  • Message text: Scheduling logic not valid: &1

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message /SAPAPO/MSDP_REL004 - Scheduling logic not valid: &1 ?
    The SAP error message /SAPAPO/MSDP_REL004 Scheduling logic not valid: &1 typically occurs in the context of Advanced Planning and Optimization (APO) within SAP, particularly when dealing with the Master Data Supply Planning (MSDP) functionality. This error indicates that there is an issue with the scheduling logic defined for a particular planning object or process.
    
    Cause: The error can be caused by several factors, including: Invalid Scheduling Parameters: The scheduling parameters defined for the planning object may not be valid or may not align with the requirements of the planning process. Missing or Incorrect Master Data: The master data (such as product, location, or resource) associated with the planning object may be incomplete or incorrectly configured. Inconsistent Time Periods: The time periods defined for the planning process may not be consistent or may overlap inappropriately.
    Configuration Issues: There may be issues with the configuration of the planning area or planning book that lead to invalid scheduling logic. Resource

    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
The AI Support Assistant is great. It provides comprehensive assistance even on the most difficult issues. I highly recommend this service.
Rate 1
John Jordan
SAP Consultant & Author