Message type: E = Error
Message class: /SAPAPO/MSDP_REL -
Message number: 004
Message text: Scheduling logic not valid: &1
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
/SAPAPO/MSDP_REL004
- Scheduling logic not valid: &1 ?The SAP error message /SAPAPO/MSDP_REL004 Scheduling logic not valid: &1 typically occurs in the context of Advanced Planning and Optimization (APO) within SAP, particularly when dealing with the Master Data Supply Planning (MSDP) functionality. This error indicates that there is an issue with the scheduling logic defined for a particular planning object or process.
Cause: The error can be caused by several factors, including: Invalid Scheduling Parameters: The scheduling parameters defined for the planning object may not be valid or may not align with the requirements of the planning process. Missing or Incorrect Master Data: The master data (such as product, location, or resource) associated with the planning object may be incomplete or incorrectly configured. Inconsistent Time Periods: The time periods defined for the planning process may not be consistent or may overlap inappropriately.
Configuration Issues: There may be issues with the configuration of the planning area or planning book that lead to invalid scheduling logic. Resource
Get instant SAP help. Sign up for our Free Essentials Plan.
/SAPAPO/MSDP_REL003
Invalid category: &1
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
/SAPAPO/MSDP_REL002
Error converting units
What causes this issue? You are editing an object with two differents units of measure. The product &v1& and the planning area &v2&...
/SAPAPO/MSDP_REL005
Unit conversion: Error reading planning area '&1'
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
/SAPAPO/MSDP_REL006
Unit conversion: Error reading product '&1'
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
Click on this link to search all SAP messages.