How To Fix /SAPAPO/MSDP_DIS053 - Header PPM/PDS &1 and sub PPM/PDS &2 have different calendars


/SAPAPO/MSDP_DIS053 - Overview

  • Message type: E = Error

  • Message class: /SAPAPO/MSDP_DIS -

  • Message number: 053

  • Message text: Header PPM/PDS &1 and sub PPM/PDS &2 have different calendars

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message /SAPAPO/MSDP_DIS053 - Header PPM/PDS &1 and sub PPM/PDS &2 have different calendars ?
    The SAP error message /SAPAPO/MSDP_DIS053 indicates that there is a mismatch between the calendars of two different planning objects, specifically a Header PPM (Production Planning Model) or PDS (Production Data Structure) and a Sub PPM/PDS. This error typically arises in the context of Advanced Planning and Optimization (APO) or Integrated Business Planning (IBP) when there is an inconsistency in the time-related data used for planning.
    
    Cause: Different Calendars: The primary cause of this error is that the header and sub PPM/PDS are assigned to different calendars. This can happen if the planning objects are created or modified with different calendar settings.
    Configuration Issues: There may be configuration issues in the system where the calendars for the planning objects were not aligned properly. Data Migration: If data was migrated from another system or if there were changes made to the planning objects, it could lead to inconsistencies in calendar assignments.
    Solution: Check Calendar Assignments: Go to the transaction

    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo simplifies finding the accurate answers to SAP message errors. I now use every week. A must have tool for anyone working with SAP! Highly recommended!
Rate 1
Kent Bettisworth
Executive SAP Consultant