How To Fix /SAPAPO/MSDP_DIS040 - Header PPM/PDS &1 does not use header resource of subresource &2


/SAPAPO/MSDP_DIS040 - Overview

  • Message type: E = Error

  • Message class: /SAPAPO/MSDP_DIS -

  • Message number: 040

  • Message text: Header PPM/PDS &1 does not use header resource of subresource &2

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message /SAPAPO/MSDP_DIS040 - Header PPM/PDS &1 does not use header resource of subresource &2 ?
    The SAP error message /SAPAPO/MSDP_DIS040 indicates that there is a mismatch between the header resource of a Production Planning Model (PPM) or a Production Data Structure (PDS) and the subresource that is being referenced. This typically occurs in the context of Advanced Planning and Optimization (APO) when the system is trying to plan or schedule production activities.
    
    Cause: Resource Configuration: The header resource defined in the PPM or PDS does not match the subresource that is being used in the planning run. This can happen if the subresource is not properly linked to the header resource. Incorrect Assignment: The subresource may not be assigned to the header resource in the resource master data. Data Inconsistency: There may be inconsistencies in the data setup, such as changes made to resources or PPMs/PDSs that have not been properly updated or synchronized.
    Solution: Check Resource Assignment: Go to the PPM or PDS in question and verify that the header resource

    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo's SAP support assistant is amazing. Saves me countless hours trying to solve complex SAP issues myself. It's a real game changer!
Rate 1
Thomas Michael
SAP Consultant, Author & Speaker