Do you have any question about this error?
Message type: E = Error
Message class: /SAPAPO/MSDP_CAP -
Message number: 231
Message text: Stock transfer for product &1 (&2) on &3 violates maximum lot size
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
/SAPAPO/MSDP_CAP231
- Stock transfer for product &1 (&2) on &3 violates maximum lot size ?The SAP error message
/SAPAPO/MSDP_CAP231
indicates that a stock transfer for a specific product violates the maximum lot size defined in the system. This error typically occurs in the context of Advanced Planning and Optimization (APO) or Supply Chain Management (SCM) when trying to transfer stock between locations or during production planning.Cause:
- Maximum Lot Size Configuration: The maximum lot size for the product in question is set in the material master or in the planning parameters. The quantity being transferred exceeds this limit.
- Transfer Quantity: The quantity specified for the stock transfer exceeds the maximum lot size defined for that product.
- Planning Strategy: The planning strategy used for the product may impose restrictions on the lot sizes that can be transferred or produced.
Solution:
- Check Maximum Lot Size: Review the maximum lot size settings for the product in the material master (transaction code
MM02
) or in the relevant planning parameters. Adjust the maximum lot size if necessary.- Adjust Transfer Quantity: Modify the quantity of the stock transfer to ensure it does not exceed the maximum lot size.
- Review Planning Parameters: If applicable, check the planning strategy and other related settings in the APO system to ensure they align with your transfer requirements.
- Consult Documentation: Refer to SAP documentation or help resources for detailed information on how to manage lot sizes and stock transfers.
Related Information:
MM02
(Change Material) or MM03
(Display Material).By following these steps, you should be able to identify the cause of the error and implement a solution to resolve it.
Get instant SAP help. Start your 7-day free trial now.
/SAPAPO/MSDP_CAP230
Stock transfer for product &1 (&2) on &3 violates minimum lot size
What causes this issue? For &V3&, there is at least one stock transfer of product &V1& using transportation lane &V2& that vi...
/SAPAPO/MSDP_CAP229
Order for location product &1/&2 on &3 violates rounding value
What causes this issue? For &V3&, there is at least one order for product &V1& in location &V2& that violates the specified r...
/SAPAPO/MSDP_CAP232
Stock transfer for product &1 (&2) on &3 violates rounding value
What causes this issue? For &V3&, there is at least one stock transfer of product &V1& using transportation lane &V2& that vi...
/SAPAPO/MSDP_CAP301
Alternative resource &1 is used in original PPMs/PDS
What causes this issue? The selected alternative resource &V1& is used in an original PPM or PDS. This could cause the system to generate cyc...
Click on this link to search all SAP messages.