Do you have any question about this error?
Message type: E = Error
Message class: /SAPAPO/MSDP_CAP -
Message number: 222
Message text: Total order quantity for location product &1/&2 increased by &3 &4
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
/SAPAPO/MSDP_CAP222
- Total order quantity for location product &1/&2 increased by &3 &4 ?The SAP error message
/SAPAPO/MSDP_CAP222
indicates that the total order quantity for a specific location product has been increased by a certain amount. This message is typically related to the Advanced Planning and Optimization (APO) module in SAP, particularly in the context of supply chain planning and capacity management.Cause:
The error message is triggered when the total order quantity for a location product exceeds the expected or allowed limits. This can happen due to various reasons, such as:
- Demand Changes: An increase in demand for the product at the specified location.
- Supply Adjustments: Changes in supply quantities or production schedules that lead to an increase in the total order quantity.
- Planning Parameters: Incorrect planning parameters or settings that do not align with the actual requirements.
- Manual Adjustments: Manual changes made to the order quantities that exceed the planned limits.
Solution:
To resolve this error, you can take the following steps:
Review Demand and Supply: Check the demand and supply data for the location product to understand why the total order quantity has increased. Look for any recent changes in demand forecasts or supply plans.
Adjust Planning Parameters: Verify the planning parameters for the product and location. Ensure that they are set correctly to accommodate the expected order quantities.
Check Order Quantities: Review the individual order quantities that contribute to the total. If there are any manual adjustments, consider reverting them or adjusting them to fit within the expected limits.
Capacity Check: Ensure that the production or storage capacity at the location can handle the increased order quantity. If necessary, adjust the capacity planning to accommodate the new requirements.
Consult Documentation: Refer to SAP documentation or help resources for specific guidance related to the error message and its implications.
Engage with Stakeholders: If the increase in order quantity is justified, communicate with relevant stakeholders (e.g., sales, production, logistics) to ensure alignment and adjust plans accordingly.
Related Information:
/SAPAPO/SDP94
(for demand planning) or /SAPAPO/MC90
(for capacity planning) to analyze the situation further.By following these steps, you should be able to identify the root cause of the error and implement a suitable solution.
Get instant SAP help. Start your 7-day free trial now.
/SAPAPO/MSDP_CAP221
CPU time limit of &1 minutes was reached
What causes this issue? You specified a maximum runtime for capacity leveling. Capacity leveling was canceled once the capacity leveling process exce...
/SAPAPO/MSDP_CAP220
Optimizer error &1 (see SNP optimizer log data)
What causes this issue? Error &V1& occurred when running the SNP optimizer.System Response Optimization-based capacity leveling uses the SNP...
/SAPAPO/MSDP_CAP223
Total order quantity for location product &1/&2 reduced by &3 &4
What causes this issue? During capacity leveling, the total order quantity for product &V1& at location &V2& was reduced by &V3&a...
/SAPAPO/MSDP_CAP224
Total stock transfer quantity for locatn product &1/&2 increased by &3 &4
What causes this issue? During capacity leveling, the total stock transfer quantity for product &V1& to location &V2& was increased b...
Click on this link to search all SAP messages.