How To Fix /SAPAPO/MSDP_BLOCK000 - The resource shall be SNP campaign relenvant (Cross-Period Lot Size)


SAP Error Message - Details

  • Message type: E = Error

  • Message class: /SAPAPO/MSDP_BLOCK -

  • Message number: 000

  • Message text: The resource shall be SNP campaign relenvant (Cross-Period Lot Size)

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message /SAPAPO/MSDP_BLOCK000 - The resource shall be SNP campaign relenvant (Cross-Period Lot Size) ?

    The SAP error message /SAPAPO/MSDP_BLOCK000 indicates that there is an issue related to the resource configuration in the Supply Network Planning (SNP) module, specifically concerning campaign management and cross-period lot sizing. This error typically arises when the system is unable to process a planning scenario due to the resource not being set up correctly for SNP campaigns.

    Cause:

    1. Resource Configuration: The resource in question may not be configured to handle SNP campaigns. This can happen if the resource is not marked as "campaign relevant" in the resource master data.
    2. Lot Size Settings: The lot size settings for the resource may not be compatible with cross-period lot sizing, which is required for campaign planning.
    3. Planning Version: The planning version being used may not support the required settings for campaign planning.
    4. Data Inconsistencies: There may be inconsistencies in the master data or planning data that prevent the system from executing the planning run.

    Solution:

    1. Check Resource Configuration:

      • Go to the resource master data in the SAP APO system.
      • Ensure that the resource is marked as "campaign relevant." This can usually be found in the resource's attributes or settings.
    2. Review Lot Size Settings:

      • Verify the lot size settings for the resource. Ensure that the settings allow for cross-period lot sizing.
      • Adjust the lot size settings if necessary to align with the requirements of the campaign.
    3. Validate Planning Version:

      • Check the planning version being used for the SNP run. Ensure that it is set up to support campaign planning and that all relevant settings are correctly configured.
    4. Data Consistency Check:

      • Perform a consistency check on the master data and planning data to identify any discrepancies that may be causing the error.
      • Correct any inconsistencies found during the check.
    5. Consult Documentation:

      • Refer to SAP documentation or help resources for specific details on configuring resources for SNP campaigns and cross-period lot sizing.
    6. Testing:

      • After making the necessary changes, run a test planning run to ensure that the error is resolved and that the system processes the campaign correctly.

    Related Information:

    • SAP Notes: Check for any relevant SAP Notes that may address this specific error or provide additional guidance on configuring resources for SNP campaigns.
    • SAP Community: Engage with the SAP Community forums to see if other users have encountered similar issues and what solutions they have implemented.
    • Training and Documentation: Consider reviewing training materials or documentation related to SNP and campaign management in SAP APO for a deeper understanding of the configuration requirements.

    By following these steps, you should be able to resolve the error and ensure that your resource is properly configured for SNP campaign planning.

    • Do you have any question about this error?


      Upgrade now to chat with this error.


Instant HelpGet instant SAP help. Start your 7-day free trial now.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo simplifies finding the accurate answers to SAP message errors. I now use every week. A must have tool for anyone working with SAP! Highly recommended!
Rate 1
Kent Bettisworth
Executive SAP Consultant