Message type: E = Error
Message class:  /SAPAPO/MC013X40 -  
Message number: 307
Message text: The CDP conversion report could not be scheduled in client &1
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
The SAP error message /SAPAPO/MC013X40307 indicates that the CDP (Capacity Deployment Planning) conversion report could not be scheduled in the specified client. This error typically arises in the context of SAP Advanced Planning and Optimization (APO) when there are issues related to scheduling background jobs or executing reports. Possible Causes: Authorization Issues: The user may not have the necessary authorizations to schedule jobs in the specified client. Client-Specific Settings: There may be client-specific settings or configurations that prevent the scheduling of the report. Background Job Configuration: The background job configuration might be incorrect or incomplete. System Load: The system may be under heavy load, causing scheduling issues. Technical Issues: There could be technical issues with the SAP system, such as database connectivity problems or system performance issues. Solutions: Check Authorizations: Ensure that the user has the necessary authorizations to schedule background jobs in the client. This can be done by checking the user's roles and authorizations in transaction
 Get instant SAP help. Sign up for our Free Essentials Plan.
Get instant SAP help. Sign up for our Free Essentials Plan. 
/SAPAPO/MC013X40306 The CDP conversion report was scheduled successfully in all clients
What causes this issue?  The conversion of the CDP data is not yet complete. The conversion job has been scheduled to run in the affected clients.Syst...
/SAPAPO/MC013X40305 The CDP conversion report could not be scheduled in all clients
What causes this issue?  The system was unable to schedule the CDP conversion report as a job in all clients.System Response  The conversion is not ca...
/SAPAPO/MC01HEUR000 Internal error
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
/SAPAPO/MC01HEUR001 Resource &1 is not classified
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
Click on this link to search all SAP messages.