Message type: E = Error
Message class: /SAPAPO/MC01 -
Message number: 195
Message text: Characteristic value assignments in PPM are used to select operations
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
/SAPAPO/MC01195
- Characteristic value assignments in PPM are used to select operations ?The SAP error message /SAPAPO/MC01195 typically occurs in the context of SAP Advanced Planning and Optimization (APO), particularly when dealing with Production Planning and detailed scheduling. This error indicates that there are issues with characteristic value assignments in the Production Planning Master Data (PPM) that are required for selecting operations.
Cause: The error message /SAPAPO/MC01195 can be triggered by several factors, including: Missing Characteristic Values: The characteristic values that are required for the operation selection in the PPM are not assigned or are missing. Incorrect Configuration: The configuration of the characteristics and their values may not be set up correctly in the system. Inconsistent Data: There may be inconsistencies in the data related to the characteristics and their assignments in the PPM. Master Data Issues: Problems with the master data, such as missing or incorrect entries in the material master or PPM, can lead to this error.
Solution: To resolve the error /SAPAPO/MC01195, you can take the following
Get instant SAP help. Sign up for our Free Essentials Plan.
/SAPAPO/MC01194
Value for lower limit exceeds value for upper limit
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
/SAPAPO/MC01193
Check the settings for characteristic & (inconsistencies)
What causes this issue? Characteristic &V1& cannot be processed in its current form. Inconsistencies occured in the maintenance of the charac...
/SAPAPO/MC01196
Value assignments in activities are used for dispatching resources
What causes this issue? The details for the valuations of an activity have just been displayed.System Response The valuation of an activity is compa...
/SAPAPO/MC01197
Chararcteristic value assignments and char. requirements are inconsistent
What causes this issue? When creating or changing an order, characteristic requirements (CDP) that contradict the characteristic value assignments ar...
Click on this link to search all SAP messages.