How To Fix /SAPAPO/MC01190 - A receipt requirement is used for plan selection


/SAPAPO/MC01190 - Overview

  • Message type: E = Error

  • Message class: /SAPAPO/MC01 -

  • Message number: 190

  • Message text: A receipt requirement is used for plan selection

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message /SAPAPO/MC01190 - A receipt requirement is used for plan selection ?
    The SAP error message /SAPAPO/MC01190 indicates that a receipt requirement is being used for plan selection in the Advanced Planning and Optimization (APO) module. This error typically arises when there is an issue with the planning setup, particularly related to the receipt requirements in the planning process.
    
    Cause: Receipt Requirement Configuration: The error may occur if the receipt requirements are not properly configured or if they are not aligned with the planning strategy. Planning Object Structure: The planning object structure may not be set up correctly to handle the receipt requirements. Data Inconsistencies: There may be inconsistencies in the master data or transaction data that are causing the planning process to fail. Selection Criteria: The selection criteria used in the planning run may not be appropriate for the receipt requirements defined.
    Solution: Check Configuration: Review the configuration of the receipt requirements in the APO system. Ensure that they are set up correctly and are compatible with the

    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo simplifies finding the accurate answers to SAP message errors. I now use every week. A must have tool for anyone working with SAP! Highly recommended!
Rate 1
Kent Bettisworth
Executive SAP Consultant