How To Fix /SAPAPO/MA691 - Not enough period lengths in PLENGTH


/SAPAPO/MA691 - Overview

  • Message type: E = Error

  • Message class: /SAPAPO/MA -

  • Message number: 691

  • Message text: Not enough period lengths in PLENGTH

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message /SAPAPO/MA691 - Not enough period lengths in PLENGTH ?
    The SAP error message /SAPAPO/MA691 Not enough period lengths in PLENGTH typically occurs in the context of SAP Advanced Planning and Optimization (APO) when there are insufficient period lengths defined for a planning object or when the planning horizon is not properly set up.
    
    Cause: Insufficient Period Lengths: The error indicates that the system does not have enough defined period lengths in the planning version or the planning object to accommodate the requested planning horizon. Planning Horizon Issues: The planning horizon may be set incorrectly, or the periods defined in the planning version do not cover the required time frame for the planning process.
    Configuration Issues: There may be a misconfiguration in the planning area or the planning version settings.
    Solution: Check Period Lengths: Go to the planning area configuration and verify the period lengths defined for the planning version you are using. Ensure that the period lengths are sufficient to cover the entire planning horizon you are

    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo's SAP support assistant is amazing. Saves me countless hours trying to solve complex SAP issues myself. It's a real game changer!
Rate 1
Thomas Michael
SAP Consultant, Author & Speaker