Message type: E = Error
Message class: /SAPAPO/LOC -
Message number: 248
Message text: Control strategy &1 does not exist
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
/SAPAPO/LOC248
- Control strategy &1 does not exist ?The SAP error message /SAPAPO/LOC248 Control strategy &1 does not exist typically occurs in the context of SAP Advanced Planning and Optimization (APO) when the system is trying to access a control strategy that has not been defined or is not available in the system.
Cause: Missing Control Strategy: The control strategy specified in the error message does not exist in the system. This could be due to a configuration oversight or because the control strategy was deleted or not created. Incorrect Configuration: The control strategy might not have been properly configured or activated in the system. Data Inconsistency: There may be inconsistencies in the master data or configuration settings that lead to the system being unable to find the specified control strategy.
Solution: Check Control Strategy Configuration: Go to the transaction code /SAPAPO/LOC or the relevant configuration area in SAP APO. Verify if the control strategy with the specified name exists. If it does not, you will
Get instant SAP help. Sign up for our Free Essentials Plan.
/SAPAPO/LOC247
Define control strategies first
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
/SAPAPO/LOC246
Multiple entries refer to strategy &1; ensure unique assignment
What causes this issue? The control strategy &V1& has been assigned to multiple geocoding levels (GC levels). You cannot make multiple assign...
/SAPAPO/LOC249
Control strategy &1 is not assigned to service &2
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
/SAPAPO/LOC250
&1 entries were added; execute mass geocoding (see long text)
What causes this issue? &V1& definitions of geocoding levels have been inserted into the database.System Response The system issues an error...
Click on this link to search all SAP messages.