How To Fix /SAPAPO/INBND018 - Calculated start date of DRP planning horizon is larger than the end date


/SAPAPO/INBND018 - Overview

  • Message type: E = Error

  • Message class: /SAPAPO/INBND -

  • Message number: 018

  • Message text: Calculated start date of DRP planning horizon is larger than the end date

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message /SAPAPO/INBND018 - Calculated start date of DRP planning horizon is larger than the end date ?
    The SAP error message /SAPAPO/INBND018 indicates that the calculated start date of the Distribution Requirements Planning (DRP) planning horizon is larger than the end date. This typically occurs in the context of planning and scheduling within SAP Advanced Planning and Optimization (APO) when the configuration of the planning horizon is not set correctly.
    
    Cause: Incorrect Planning Horizon Configuration: The planning horizon may be set incorrectly in the system, leading to a situation where the start date is after the end date. Master Data Issues: There may be issues with the master data, such as incorrect lead times or planning parameters that affect the calculation of the planning horizon. Time Period Settings: The time periods defined for planning (like the start and end dates) may not align properly, causing the system to calculate an invalid range. Changes in Calendar Settings: If there have been recent changes to the calendar settings or holidays, it may affect the

    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo's SAP support assistant is amazing. Saves me countless hours trying to solve complex SAP issues myself. It's a real game changer!
Rate 1
Thomas Michael
SAP Consultant, Author & Speaker