How To Fix /SAPAPO/ESPP_PR432 - MPE is too high


/SAPAPO/ESPP_PR432 - Overview

  • Message type: E = Error

  • Message class: /SAPAPO/ESPP_PR -

  • Message number: 432

  • Message text: MPE is too high

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message /SAPAPO/ESPP_PR432 - MPE is too high ?
    The SAP error message /SAPAPO/ESPP_PR432 MPE is too high typically occurs in the context of SAP Advanced Planning and Optimization (APO), particularly when dealing with the planning and execution of production or procurement processes. The error indicates that the Maximum Production Efficiency (MPE) value set for a particular resource or product is too high, which can lead to unrealistic planning scenarios.
    
    Cause: MPE Configuration: The MPE value defined in the system for a specific resource or product may be set too high, exceeding the realistic production capabilities. Data Inconsistencies: There may be inconsistencies in the master data, such as incorrect settings in the resource or product master records. Planning Parameters: The planning parameters or settings in the APO system may not align with the actual production capabilities or constraints of the resources. Capacity Constraints: The system may be trying to allocate more production than what is feasible based on the available capacity and MPE settings.
    Solution: Review

    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Related SAP Error Messages

Click the links below to see the following related messages:
  • /SAPAPO/ESPP_PR431 Error total is too high
    What causes this issue? The limit that you specified for this error measure was exceeded.System Response The system only issues a warning.How to fix...

  • /SAPAPO/ESPP_PR430 MAD is too high
    What causes this issue? The limit that you specified for this error measure was exceeded.System Response The system only issues a warning.How to fix...

  • /SAPAPO/ESPP_PR433 MAPE is too high
    What causes this issue? The limit that you specified for this error measure was exceeded.System Response The system only issues a warning.How to fix...

  • /SAPAPO/ESPP_PR434 MSE is too high
    What causes this issue? The limit that you specified for this error measure was exceeded.System Response The system only issues a warning.How to fix...

Click on this link to search all SAP messages.


Rating
The AI Support Assistant is great. It provides comprehensive assistance even on the most difficult issues. I highly recommend this service.
Rate 1
John Jordan
SAP Consultant & Author