How To Fix /SAPAPO/ESPP_PR428 - Ex-post forecast carried out


/SAPAPO/ESPP_PR428 - Overview

  • Message type: E = Error

  • Message class: /SAPAPO/ESPP_PR -

  • Message number: 428

  • Message text: Ex-post forecast carried out

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message /SAPAPO/ESPP_PR428 - Ex-post forecast carried out ?
    The SAP error message /SAPAPO/ESPP_PR428 indicates that an ex-post forecast has been carried out for a particular product or location. This message typically arises in the context of SAP Advanced Planning and Optimization (APO) when dealing with forecasting and planning processes.
    
    Cause: The error message /SAPAPO/ESPP_PR428 is triggered when: An attempt is made to perform a forecast or planning operation that is not compatible with an existing ex-post forecast. The system has already generated an ex-post forecast for the specified product/location combination, and the user is trying to perform an operation that conflicts with this existing forecast.
    Solution: To resolve this error, you can consider the following steps: Review Existing Forecasts: Check if there is an existing ex-post forecast for the product/location in question. You can do this by navigating to the relevant forecasting transaction in SAP APO. Delete or Adjust the Ex-Post Forecast: If the existing ex-post forecast is no longer needed or is incorrect, you may

    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo's SAP support assistant is amazing. Saves me countless hours trying to solve complex SAP issues myself. It's a real game changer!
Rate 1
Thomas Michael
SAP Consultant, Author & Speaker