Do you have any question about this error?
Message type: E = Error
Message class: /SAPAPO/EOGL -
Message number: 163
Message text: Error in length plan! No valuation of the individual length for item &
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
/SAPAPO/EOGL163
- Error in length plan! No valuation of the individual length for item & ?The SAP error message
/SAPAPO/EOGL163
indicates that there is an issue with the length planning in the Advanced Planning and Optimization (APO) module. Specifically, it states that there is "No valuation of the individual length for item &," which means that the system cannot find the necessary data to perform length planning for the specified item.Cause:
- Missing Data: The most common cause of this error is that the individual length valuation for the item in question has not been maintained in the system. This could be due to missing master data or configuration settings.
- Incorrect Configuration: There may be issues with the configuration settings related to length planning in the APO system.
- Data Inconsistency: There could be inconsistencies in the data between the APO and the ERP system, especially if the data has not been synchronized properly.
- Item Not Defined: The item for which the error is occurring may not be defined correctly in the system or may not have the necessary attributes for length planning.
Solution:
- Check Master Data: Verify that the master data for the item includes the necessary length valuation. This can be done by checking the material master record in the ERP system.
- Maintain Length Valuation: If the length valuation is missing, you will need to maintain it. This can typically be done in the material master under the relevant planning views.
- Review Configuration: Check the configuration settings in the APO system to ensure that length planning is set up correctly. This may involve reviewing the planning area settings and the relevant key figures.
- Data Synchronization: Ensure that the data between the ERP and APO systems is synchronized. You may need to run data transfer jobs or check for any errors in the data transfer process.
- Consult Documentation: Refer to SAP documentation or notes related to length planning and the specific error message for additional guidance.
Related Information:
/SAPAPO/SDP94
(for planning book) or /SAPAPO/MC62
(for checking key figures) to analyze the planning data.By following these steps, you should be able to identify the root cause of the error and implement the necessary solutions to resolve it.
Get instant SAP help. Start your 7-day free trial now.
/SAPAPO/EOGL161
(&) Error in calc. of comp. & (item &) in BOM of material &
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
/SAPAPO/EOGL160
(&) Error occurred in routing of material & in operation &
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
/SAPAPO/EOGL164
Error in length plan! Actual routing differs from rout. used in prod.ord.
What causes this issue? It was tried to create a length plan. This routing, which was determined to create the planned, respective production order (...
/SAPAPO/EOGL165
Manual pegging in use. Check pegging of quantity &1 between &2 and &3.
What causes this issue? A manual pegging relation contradicts the logic of the standard LPP heuristic. However as the relation has been created manua...
Click on this link to search all SAP messages.