Do you have any question about this error?
Message type: E = Error
Message class: /SAPAPO/EOGL -
Message number: 113
Message text: Product & to be planned is not length-based
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
/SAPAPO/EOGL113
- Product & to be planned is not length-based ?The SAP error message
/SAPAPO/EOGL113
indicates that the product you are trying to plan is not length-based. This error typically occurs in the context of Advanced Planning and Optimization (APO) when you are working with products that require specific planning parameters, such as those related to production or procurement processes.Cause:
- Product Configuration: The product in question is not configured to be length-based in the system. Length-based planning is often used for products that have a specific length measurement, such as textiles, pipes, or other linear materials.
- Master Data Issues: The product master data may not have the necessary settings or characteristics defined to allow for length-based planning.
- Planning Object Settings: The planning object settings may not be correctly defined to accommodate length-based planning for the product.
Solution:
Check Product Master Data:
- Go to the product master data in SAP APO and verify the settings related to length-based planning.
- Ensure that the product is marked as length-based if it is supposed to be.
Adjust Planning Parameters:
- If the product should not be length-based, ensure that the planning parameters and strategies are correctly set up for non-length-based products.
- Review the planning book and key figures to ensure they align with the product's characteristics.
Consult Configuration:
- If you have access to the configuration settings, check the configuration for length-based planning in the APO system.
- Ensure that the necessary settings are in place for products that require length-based planning.
Review Planning Object Settings:
- Check the settings for the planning object in the APO system to ensure that it is configured correctly for the type of planning you are attempting to perform.
Consult Documentation:
- Refer to SAP documentation or help resources for more detailed information on length-based planning and the specific requirements for products in your system.
Related Information:
By following these steps, you should be able to identify the cause of the error and implement the necessary changes to resolve it.
Get instant SAP help. Start your 7-day free trial now.
/SAPAPO/EOGL112
Incorrect lot-sizing procedure set defined in product master of material
What causes this issue? The lot-sizing procedure that has been defined in the product master for the material to be planned is not supported by the L...
/SAPAPO/EOGL111
Cannot find suitable procurement source
What causes this issue? The system could not find a procurement source. Either no sources have been activated, or those that have been activated are ...
/SAPAPO/EOGL114
Individual length & is greater than & (maximum lot size)
What causes this issue? A periodic lot size procedure with a maximum lot size was set up for the product in the product master. A requirement require...
/SAPAPO/EOGL115
Without production; length calculation was not performed for operation &1
What causes this issue? For this activity, you have not entered an activity with the activity category <ZK>Produce</>.System Response Th...
Click on this link to search all SAP messages.