Stop googling SAP errors. Use our Free Essentials plan instead - no credit card needed. Start Now

Close

How To Fix /SAPAPO/DMRES818 - Action will result in negative capacities. Action was cancelled


SAP Error Message - Details

  • Message type: E = Error

  • Message class: /SAPAPO/DMRES -

  • Message number: 818

  • Message text: Action will result in negative capacities. Action was cancelled

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message /SAPAPO/DMRES818 - Action will result in negative capacities. Action was cancelled ?

    The SAP error message /SAPAPO/DMRES818 indicates that an action in the Demand Management or Capacity Planning process will lead to negative capacities for a resource. This typically occurs when the planned demand exceeds the available capacity of a resource, which can happen during planning activities in SAP Advanced Planning and Optimization (APO).

    Cause:

    1. Excessive Demand: The planned demand for a product exceeds the available capacity of the production resource.
    2. Capacity Constraints: The resource may have been over-allocated due to other planned orders, maintenance, or other activities that consume capacity.
    3. Incorrect Capacity Settings: The capacity settings for the resource may not be configured correctly, leading to an underestimation of available capacity.
    4. Planning Version Issues: The planning version being used may not reflect the most current capacity or demand data.
    5. Resource Availability: The resource may be unavailable due to maintenance, holidays, or other scheduling conflicts.

    Solution:

    1. Review Demand and Capacity: Check the planned demand and compare it with the available capacity for the resource. Adjust the demand or capacity as necessary.
    2. Adjust Planning Parameters: Modify the planning parameters for the resource to ensure that the capacity is accurately reflected.
    3. Reschedule Orders: If possible, reschedule or redistribute planned orders to balance the load on the resource.
    4. Check Resource Allocation: Ensure that the resource is not over-allocated and that other orders or activities are not consuming more capacity than expected.
    5. Use Alternative Resources: If applicable, consider using alternative resources that may have available capacity.
    6. Capacity Planning: Conduct a thorough capacity planning exercise to identify potential bottlenecks and adjust the production plan accordingly.
    7. Consult Documentation: Review SAP documentation or consult with your SAP support team for specific configuration settings related to capacity planning.

    Related Information:

    • Transaction Codes: You may want to use transaction codes like /SAPAPO/DM (Demand Management) or /SAPAPO/RES (Resource Planning) to analyze the situation further.
    • Capacity Planning Reports: Utilize capacity planning reports in SAP APO to get insights into resource utilization and availability.
    • SAP Notes: Check for any relevant SAP Notes that may address known issues or provide additional guidance on capacity planning in APO.
    • Training and Documentation: Ensure that users involved in planning are adequately trained on capacity management and the implications of demand planning.

    By addressing the underlying causes and implementing the suggested solutions, you should be able to resolve the error and proceed with your planning activities in SAP APO.

    • Do you have any question about this error?


      Upgrade now to chat with this error.


Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo's SAP support assistant is amazing. Saves me countless hours trying to solve complex SAP issues myself. It's a real game changer!
Rate 1
Thomas Michael
SAP Consultant, Author & Speaker