Do you have any question about this error?
Message type: E = Error
Message class: /SAPAPO/DMRES -
Message number: 182
Message text: The changed entry is outside of the defined time horizon
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
/SAPAPO/DMRES182
- The changed entry is outside of the defined time horizon ?The SAP error message
/SAPAPO/DMRES182
indicates that a change you are trying to make in the Demand Management or Supply Network Planning (SNP) area is outside the defined time horizon. This typically occurs when you attempt to modify or create a planning entry (like a forecast or a planned order) that falls outside the time frame that has been set in the system.Cause:
- Time Horizon Settings: The time horizon for planning is defined in the configuration settings of the SAP APO (Advanced Planning and Optimization) system. If the date of the entry you are trying to change is beyond this horizon, the system will not allow the change.
- Planning Version: Different planning versions may have different time horizons set. If you are working in a version that has a shorter time horizon, you may encounter this error.
- Data Locking: Sometimes, if the data is locked for a certain period (for example, during a planning run), you may also see this error.
Solution:
Check Time Horizon Settings:
- Go to the configuration settings in SAP APO and check the time horizon defined for the relevant planning area. You can do this by navigating to the relevant configuration transaction (like
/SAPAPO/SDP94
for demand planning).- Adjust the time horizon if necessary to include the date you are trying to change.
Use the Correct Planning Version:
- Ensure that you are working in the correct planning version that has the appropriate time horizon set. You can check this in the planning book or by using transaction
/SAPAPO/SDP94
.Adjust the Date:
- If possible, adjust the date of the entry you are trying to change to fall within the defined time horizon.
Consult with Basis or Configuration Team:
- If you do not have the necessary permissions to change the time horizon settings, consult with your SAP Basis or configuration team to make the required adjustments.
Check for Data Locking:
- If the data is locked, you may need to wait until the planning run is complete or the lock is released.
Related Information:
/SAPAPO/SDP94
for demand planning and /SAPAPO/MC90
for configuration settings.By following these steps, you should be able to resolve the error message /SAPAPO/DMRES182
and successfully make the necessary changes in your planning data.
Get instant SAP help. Start your 7-day free trial now.
/SAPAPO/DMRES181
The relationship of rate to base rate may not be larger than 10
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
/SAPAPO/DMRES180
Dimension of rate is not equal to dimension of the base rate of resource
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
/SAPAPO/DMRES183
Resource &1 has already been transferred as &2 from the R/3 system
What causes this issue? The capacity transferred from the R/3 system has already been created in the APO system under a different resource name.Syste...
/SAPAPO/DMRES184
Resource &1 has already been transferred from R/3 with a different ID
What causes this issue? The resource has already been transferred from the R/3 system, with a different capacity ID.System Response The system issue...
Click on this link to search all SAP messages.