How To Fix /SAPAPO/DMRES153 - Resource type does not have a time capacity


SAP Error Message - Details

  • Message type: E = Error

  • Message class: /SAPAPO/DMRES -

  • Message number: 153

  • Message text: Resource type does not have a time capacity

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message /SAPAPO/DMRES153 - Resource type does not have a time capacity ?

    The SAP error message /SAPAPO/DMRES153 Resource type does not have a time capacity typically occurs in the context of SAP Advanced Planning and Optimization (APO) when dealing with resource planning. This error indicates that the resource type you are trying to use does not have a defined time capacity, which is necessary for scheduling and planning activities.

    Cause:

    1. Missing Time Capacity Definition: The resource type in question has not been configured with a time capacity in the system. This means that the system does not know how much time the resource can be utilized for production or planning activities.
    2. Incorrect Resource Type Assignment: The resource type assigned to a specific resource may not be set up correctly or may not be intended for the type of planning you are trying to perform.
    3. Configuration Issues: There may be issues in the configuration of the resource type in the APO system, leading to the absence of time capacity settings.

    Solution:

    1. Define Time Capacity:

      • Go to the configuration settings for the resource type in the SAP APO system.
      • Ensure that the time capacity is defined for the resource type. This can typically be done in the transaction code /SAPAPO/RES01 (Resource Planning) or through the relevant customizing settings in the SAP IMG.
      • Check the settings under the resource type to ensure that the capacity is defined in terms of available hours, shifts, or any other relevant time units.
    2. Check Resource Type Assignment:

      • Verify that the resource type assigned to the resource is correct and intended for the operations you are planning.
      • If necessary, reassign the resource to a different resource type that has the appropriate time capacity defined.
    3. Review Configuration:

      • Review the configuration of the resource type in the SAP system to ensure that all necessary parameters are set correctly.
      • Consult with your SAP Basis or APO configuration team if you are unsure about the settings.
    4. Testing:

      • After making the necessary changes, test the resource planning or scheduling process again to ensure that the error no longer occurs.

    Related Information:

    • Transaction Codes: Familiarize yourself with relevant transaction codes such as /SAPAPO/RES01 for resource planning and /SAPAPO/RES02 for resource overview.
    • Documentation: Refer to SAP Help documentation for detailed guidance on resource planning and capacity management in SAP APO.
    • SAP Notes: Check for any relevant SAP Notes that may address specific issues or provide additional guidance related to this error message.

    By following these steps, you should be able to resolve the error message /SAPAPO/DMRES153 and ensure that your resource planning activities can proceed without issues.

    • Do you have any question about this error?


      Upgrade now to chat with this error.


Instant HelpGet instant SAP help. Start your 7-day free trial now.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo simplifies finding the accurate answers to SAP message errors. I now use every week. A must have tool for anyone working with SAP! Highly recommended!
Rate 1
Kent Bettisworth
Executive SAP Consultant