How To Fix /SAPAPO/DMRES101 - Dimension &1 shift factor &2 not the same as dimension &3 resource &4


/SAPAPO/DMRES101 - Overview

  • Message type: E = Error

  • Message class: /SAPAPO/DMRES -

  • Message number: 101

  • Message text: Dimension &1 shift factor &2 not the same as dimension &3 resource &4

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message /SAPAPO/DMRES101 - Dimension &1 shift factor &2 not the same as dimension &3 resource &4 ?
    The SAP error message /SAPAPO/DMRES101 typically occurs in the context of SAP Advanced Planning and Optimization (APO), particularly when dealing with resource planning and capacity management. This error indicates a mismatch in the shift factors for a specific dimension of a resource.
    
    Cause: The error message is triggered when the shift factor for a particular dimension (e.g., a specific resource or production line) does not match the expected shift factor for another dimension or resource. This can happen due to:
    Configuration Issues: The shift factors for the dimensions of the resources may not have been configured correctly in the system. Data Inconsistencies: There may be inconsistencies in the master data or planning data related to the resources and their dimensions. Changes in Resource Settings: If there have been recent changes to the resource settings or dimensions, it may lead to discrepancies in the shift factors.
    Solution: To resolve this error, you can take the following steps: Check Resource

    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo simplifies finding the accurate answers to SAP message errors. I now use every week. A must have tool for anyone working with SAP! Highly recommended!
Rate 1
Kent Bettisworth
Executive SAP Consultant