Message type: E = Error
Message class: /SAPAPO/DMRES -
Message number: 089
Message text: The resource specified is not of type line or line-mix
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
/SAPAPO/DMRES089
- The resource specified is not of type line or line-mix ?The SAP error message
/SAPAPO/DMRES089
indicates that the resource specified in your demand management or production planning process is not of the expected type, specifically that it is neither a "line" resource nor a "line-mix" resource. This error typically arises in the context of Advanced Planning and Optimization (APO) when trying to assign or utilize a resource that does not meet the required criteria for the operation being performed.Cause:
- Resource Type Mismatch: The resource you are trying to use is not defined as a line or line-mix resource in the system. This could happen if the resource was incorrectly configured or if the wrong resource is being selected for a particular operation.
- Configuration Issues: The resource may not have been set up correctly in the APO system, or it may not have the necessary attributes assigned to it.
- Data Integrity Issues: There may be inconsistencies in the master data, such as missing or incorrect settings for the resource.
Solution:
Check Resource Configuration:
- Go to the resource master data in APO and verify that the resource is indeed defined as a line or line-mix resource.
- Ensure that the resource type is correctly set in the resource master data.
Correct Resource Assignment:
- If you are trying to assign a resource in a planning run or during a production order creation, ensure that you are selecting the correct resource that meets the required type.
Review Planning Settings:
- Check the planning settings and ensure that the resource is included in the relevant planning scenarios and that it is configured to be used for the intended operations.
Consult Documentation:
- Refer to SAP documentation or help resources for detailed information on resource types and their configurations.
Testing:
- After making changes, perform a test run to ensure that the error does not reoccur.
Related Information:
/SAPAPO/RES01
for resource master data.If the problem persists after following these steps, it may be beneficial to consult with your SAP support team or a consultant who specializes in SAP APO for further assistance.
Get instant SAP help. Start your 7-day free trial now.
/SAPAPO/DMRES088
Product-dependent rate &1 is locked by user &2
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
/SAPAPO/DMRES087
Product-dependent rate & still in use
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
/SAPAPO/DMRES090
Dimension &1 shift factor not same as dimension &2 of resource &3
What causes this issue? In the resource, you are using a definition of shift factors whose unit of measure does not correspond to the dimension of th...
/SAPAPO/DMRES091