How To Fix /SAPAPO/DMRES080 - Resource not used


SAP Error Message - Details

  • Message type: E = Error

  • Message class: /SAPAPO/DMRES -

  • Message number: 080

  • Message text: Resource not used

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message /SAPAPO/DMRES080 - Resource not used ?
    The SAP error message /SAPAPO/DMRES080 Resource not used typically occurs in the context of SAP Advanced Planning and Optimization (APO), particularly when dealing with resource planning and scheduling. This message indicates that a specific resource is not being utilized in the planning process, which can lead to inefficiencies or underutilization of resources.
    Causes:
    
    Resource Configuration: The resource may not be properly configured in the system. This includes settings related to capacity, availability, or assignment to specific production processes.
    Planning Parameters: The planning parameters may not be set correctly, leading to the resource not being considered in the planning run.
    Demand and Supply Mismatch: There may be insufficient demand for the resource, or the supply chain may not require the resource for the current planning horizon.
    Resource Assignment: The resource might not be assigned to any production or planning orders, leading to it being marked as unused.
    Planning Version: The planning version being used may not include

    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo simplifies finding the accurate answers to SAP message errors. I now use every week. A must have tool for anyone working with SAP! Highly recommended!
Rate 1
Kent Bettisworth
Executive SAP Consultant