Do you have any question about this error?
Message type: E = Error
Message class: /SAPAPO/DMRES -
Message number: 066
Message text: A component of shift sequence & has been locked
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
/SAPAPO/DMRES066
- A component of shift sequence & has been locked ?The SAP error message
/SAPAPO/DMRES066
indicates that a component of a shift sequence has been locked. This typically occurs in the context of SAP Advanced Planning and Optimization (APO), particularly when dealing with production planning and scheduling.Cause:
Locked Resources: The error usually arises when a resource (such as a machine or work center) that is part of a shift sequence is currently locked by another user or process. This can happen if:
- Another user is currently editing the shift sequence.
- A background job is running that is using the same resource.
- The resource is in use in another planning scenario.
Authorization Issues: Sometimes, the user may not have the necessary authorizations to access or modify the shift sequence.
System Configuration: There may be configuration settings that prevent changes to the shift sequence under certain conditions.
Solution:
Check Locks:
- Use transaction code
SM12
to check for any locks on the resource. If you find a lock that is not needed, you can delete it (if you have the necessary authorizations).Wait and Retry: If the lock is due to another user or process, you may need to wait until the other user has finished their work or the background job has completed.
Review Authorizations: Ensure that you have the necessary authorizations to access and modify the shift sequence. You may need to contact your SAP security team if you suspect authorization issues.
Check Configuration: Review the configuration settings related to the shift sequences and resources in the APO system. Ensure that there are no settings that would prevent access.
Consult Documentation: Refer to SAP documentation or notes related to the specific error message for additional troubleshooting steps or patches that may be available.
Related Information:
SM12
(to check locks), CIF
(to check integration with other systems), and SCC4
(to check client settings).If the problem persists after trying the above solutions, it may be necessary to involve your SAP Basis or technical support team for further investigation.
Get instant SAP help. Start your 7-day free trial now.
/SAPAPO/DMRES065
Setup matrix &1 does not exist in location &2
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
/SAPAPO/DMRES064
You can only create resources independent of the planning version
What causes this issue? You want to create a resource. Resources can only be created independently from the planning version. When you assign a resou...
/SAPAPO/DMRES067
Enter period type
What causes this issue? You would like to refer the resource capacity to a period of one or more workdays in order to describe the production or cons...
/SAPAPO/DMRES068
Enter the number of periods
What causes this issue? You would like to refer the resource capacity to a period of one or more workdays in order to, for example, describe the prod...
Click on this link to search all SAP messages.