Do you have any question about this error?
Message type: E = Error
Message class: /SAPAPO/DMRES -
Message number: 009
Message text: Enter capacity
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
/SAPAPO/DMRES009
- Enter capacity ?The SAP error message
/SAPAPO/DMRES009 Enter capacity
typically occurs in the context of SAP Advanced Planning and Optimization (APO), particularly when dealing with resource planning and capacity management. This error indicates that the system requires you to enter capacity information for a specific resource or production process, but it has not been provided.Cause:
- Missing Capacity Data: The most common cause of this error is that the capacity data for the resource in question has not been defined or is incomplete.
- Incorrect Resource Configuration: The resource may not be properly configured in the system, leading to the inability to allocate or recognize capacity.
- Planning Version Issues: The planning version being used may not have the necessary capacity data.
- Resource Availability: The resource may not be available for the planned time period, leading to a lack of capacity.
Solution:
Enter Capacity Data:
- Navigate to the relevant transaction (e.g.,
/SAPAPO/DMRES
for resource planning).- Ensure that you enter the required capacity data for the resource in question.
- Check if the capacity is defined for the correct planning version.
Check Resource Configuration:
- Go to the resource master data and verify that all necessary fields are filled out correctly.
- Ensure that the resource is active and available for planning.
Review Planning Versions:
- Make sure you are using the correct planning version that contains the necessary capacity data.
- If needed, create or adjust the planning version to include the required capacity.
Resource Availability Check:
- Check the availability of the resource for the planned time frame.
- If the resource is not available, consider adjusting the planning or resource allocation.
Consult Documentation:
- Refer to SAP documentation or help resources for specific guidance on capacity planning and resource management in APO.
Related Information:
/SAPAPO/DMRES
for resource management and /SAPAPO/DP
for demand planning.If the issue persists after following these steps, it may be beneficial to consult with your SAP support team or a technical consultant who specializes in SAP APO for further assistance.
Get instant SAP help. Start your 7-day free trial now.
/SAPAPO/DMRES008
Enter rate of resource utilization as a percentage
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
/SAPAPO/DMRES007
Enter calendar
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
/SAPAPO/DMRES010
Enter a unit of measurement
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
/SAPAPO/DMRES011
No capacity variants exist for any of the selected resources
What causes this issue? You are trying to create a time interval by defining either the capacity or the length of time the resource is available. Tim...
Click on this link to search all SAP messages.