How To Fix /SAPAPO/DM_SCHEDFAIL074 - Activity &1 was reset to original position


/SAPAPO/DM_SCHEDFAIL074 - Overview

  • Message type: E = Error

  • Message class: /SAPAPO/DM_SCHEDFAIL -

  • Message number: 074

  • Message text: Activity &1 was reset to original position

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message /SAPAPO/DM_SCHEDFAIL074 - Activity &1 was reset to original position ?
    The SAP error message /SAPAPO/DM_SCHEDFAIL074 Activity &1 was reset to original position typically occurs in the context of SAP Advanced Planning and Optimization (APO) when there is an issue with scheduling activities in a production or planning environment. This message indicates that a specific activity (denoted by &1) could not be scheduled as intended and has been reverted to its original position in the planning sequence.
    Causes:
    
    Resource Constraints: The activity may be unable to be scheduled due to resource constraints, such as insufficient capacity or availability of the required resources (machines, labor, etc.).
    Conflicting Activities: There may be other activities scheduled at the same time that conflict with the current activity, preventing it from being scheduled.
    Incorrect Planning Parameters: The planning parameters or settings may not be configured correctly, leading to scheduling failures.
    Data Inconsistencies: There could be inconsistencies in the master data or transaction data that affect the scheduling process.
    Time Constraints: The activity

    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo's SAP support assistant is amazing. Saves me countless hours trying to solve complex SAP issues myself. It's a real game changer!
Rate 1
Thomas Michael
SAP Consultant, Author & Speaker