Message type: E = Error
Message class: /SAPAPO/DM_SCHEDFAIL -
Message number: 020
Message text: Activity &1 already confirmed
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
/SAPAPO/DM_SCHEDFAIL020
- Activity &1 already confirmed ?The SAP error message /SAPAPO/DM_SCHEDFAIL020 Activity &1 already confirmed typically occurs in the context of SAP Advanced Planning and Optimization (APO) when there is an attempt to confirm an activity that has already been confirmed in the system. This can happen in various scenarios, such as during production planning, scheduling, or when working with the detailed scheduling board.
Cause: Duplicate Confirmation: The most common cause of this error is that the activity (e.g., a production order, a planned order, or a process order) has already been confirmed in the system. This means that the system does not allow a second confirmation for the same activity. Concurrency Issues: If multiple users or processes are trying to confirm the same activity simultaneously, it can lead to this error. Data Integrity Issues: There may be inconsistencies in the data, such as a failure to update the status of the activity correctly.
Solution: Check Activity Status: Verify the status of
Get instant SAP help. Sign up for our Free Essentials Plan.
/SAPAPO/DM_SCHEDFAIL019
Timeout
What causes this issue? INCLUDE DETAIL_TERMINPROTOKOLL OBJECT DOKU ID TXSystem Response The system issues an error message and will not allow you to...
/SAPAPO/DM_SCHEDFAIL018
System cannot schedule or reschedule an activity &1
What causes this issue? INCLUDE DETAIL_TERMINPROTOKOLL OBJECT DOKU ID TXSystem Response The system issues an error message and will not allow you to...
/SAPAPO/DM_SCHEDFAIL021
Activity &1 is outside the planning period
What causes this issue? INCLUDE DETAIL_TERMINPROTOKOLL OBJECT DOKU ID TXSystem Response The system issues an error message and will not allow you to...
/SAPAPO/DM_SCHEDFAIL022
Order structure contains a cycle
What causes this issue? INCLUDE DETAIL_TERMINPROTOKOLL OBJECT DOKU ID TXSystem Response The system issues an error message and will not allow you to...
Click on this link to search all SAP messages.