Message type: E = Error
Message class: /SAPAPO/DEPL_MESS -
Message number: 326
Message text: Earliest start of supplier lead time is &1
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
/SAPAPO/DEPL_MESS326
- Earliest start of supplier lead time is &1 ?The SAP error message
/SAPAPO/DEPL_MESS326
indicates that the earliest start date for a supplier lead time is not feasible based on the current planning parameters. This typically occurs in the context of Advanced Planning and Optimization (APO) when the system is trying to schedule a delivery or production order but finds that the lead time constraints cannot be met.Cause:
- Lead Time Configuration: The lead time for the supplier may be set incorrectly or is too long, causing the system to determine that the earliest possible start date is beyond the acceptable range.
- Planning Parameters: The planning parameters such as safety stock, reorder point, or other inventory management settings may not align with the lead time settings.
- Demand and Supply Mismatch: There may be a mismatch between the demand and the available supply, leading to scheduling issues.
- Calendar Settings: The calendar settings (working days, holidays) may not be configured correctly, affecting the calculation of lead times.
- Resource Availability: If the resources required for production or delivery are not available, it can push the start date further out.
Solution:
- Review Lead Time Settings: Check the lead time settings for the supplier in the material master or the relevant planning book. Ensure that they are realistic and align with the actual supplier capabilities.
- Adjust Planning Parameters: Review and adjust the planning parameters to ensure they are set correctly. This includes safety stock levels, reorder points, and other relevant settings.
- Check Demand and Supply: Analyze the demand and supply situation to ensure that there is a balance. If there is excess demand, consider adjusting the forecast or increasing supply.
- Verify Calendar Settings: Ensure that the calendar settings are correct and that the system recognizes working days and holidays appropriately.
- Resource Planning: Check the availability of resources and ensure that they are scheduled correctly. If necessary, adjust the production schedule to accommodate resource availability.
- Run a New Planning Run: After making adjustments, run a new planning run to see if the issue is resolved.
Related Information:
/SAPAPO/SDP94
(for planning book) or /SAPAPO/MC90
(for checking the planning run) to analyze the situation further.If the issue persists after trying the above solutions, it may be beneficial to consult with your SAP support team or a consultant who specializes in SAP APO for further assistance.
Get instant SAP help. Start your 7-day free trial now.
/SAPAPO/DEPL_MESS325
Earliest start of BOD procurement lead time is &1
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
/SAPAPO/DEPL_MESS324
No product interchangeability group found for product &1 at location &2
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
/SAPAPO/DEPL_MESS327
Start date of buffer time is &1
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
/SAPAPO/DEPL_MESS328
Start date of safety stock buffer time is &1
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...