How To Fix /SAPAPO/DEPL_MESS305 - Successor product planning date at location &1 is specified for &2


/SAPAPO/DEPL_MESS305 - Overview

  • Message type: E = Error

  • Message class: /SAPAPO/DEPL_MESS -

  • Message number: 305

  • Message text: Successor product planning date at location &1 is specified for &2

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


/SAPAPO/DEPL_MESS305 - Details

  • The SAP error message /SAPAPO/DEPL_MESS305 indicates that there is an issue with the planning date for a successor product at a specific location. This message typically arises in the context of Advanced Planning and Optimization (APO) within SAP, particularly when dealing with product transitions or product lifecycle management.
    
    Cause: The error message is triggered when: A successor product has been defined for a product, but the planning date for the successor product at the specified location is not set correctly. The planning date for the successor product is either in the past or not aligned with the expected planning horizon. There may be inconsistencies in the master data or planning data related to the product or location.
    Solution: To resolve this error, you can take the following steps: Check Product Master Data: Go to the product master data for the successor product and ensure that the planning date is correctly set. Verify that the successor product is correctly defined in

    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


/SAPAPO/DEPL_MESS305 - Related SAP Errors

Click on this link to search all SAP messages.


Rating
ERPlingo's SAP support assistant is amazing. Saves me countless hours trying to solve complex SAP issues myself. It's a real game changer!
Rate 1
Thomas Michael
SAP Consultant, Author & Speaker