How To Fix /SAPAPO/DEPL_MESS058 - Error when initializing SPP scheduling


/SAPAPO/DEPL_MESS058 - Overview

  • Message type: E = Error

  • Message class: /SAPAPO/DEPL_MESS -

  • Message number: 058

  • Message text: Error when initializing SPP scheduling

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message /SAPAPO/DEPL_MESS058 - Error when initializing SPP scheduling ?
    The SAP error message /SAPAPO/DEPL_MESS058 typically occurs in the context of SAP Advanced Planning and Optimization (APO), specifically when initializing the Supply Network Planning (SNP) or Production Planning and Detailed Scheduling (PP/DS) processes. This error can arise due to various reasons, often related to configuration issues, master data inconsistencies, or problems with the planning run setup.
    Cause
    The error message /SAPAPO/DEPL_MESS058 generally indicates that there is an issue with the initialization of the SPP (Service Parts Planning) scheduling. Common causes include:
    
    Missing or Incomplete Master Data: Required master data such as product master, location master, or resource master may be missing or incomplete.
    
    Configuration Issues: Incorrect settings in the planning area or planning book configuration can lead to this error. Data Consistency Issues: Inconsistencies in the data, such as invalid or missing key figures, can trigger this error. Planning Version Issues: The planning version being used may not be correctly set up or may not have

    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo simplifies finding the accurate answers to SAP message errors. I now use every week. A must have tool for anyone working with SAP! Highly recommended!
Rate 1
Kent Bettisworth
Executive SAP Consultant