Do you have any question about this error?
Message type: E = Error
Message class: /SAPAPO/DEPL_MESS -
Message number: 019
Message text: Route slower than lane (product &1 from &2 to &3, expedited shipment)
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
/SAPAPO/DEPL_MESS019
- Route slower than lane (product &1 from &2 to &3, expedited shipment) ?The SAP error message
/SAPAPO/DEPL_MESS019
indicates that there is a discrepancy between the route and the lane in terms of transportation time. Specifically, it suggests that the route defined for a product is slower than the lane that has been defined for expedited shipments. This can lead to issues in planning and execution of transportation in the SAP Advanced Planning and Optimization (APO) module.Cause:
- Route Configuration: The route defined for the product may have a longer transportation time than the lane defined for expedited shipments.
- Master Data Issues: There may be inconsistencies in the master data for the product, route, or transportation lanes.
- Planning Parameters: The planning parameters set for the product or transportation lanes may not align with the expected delivery times.
- Transportation Mode: The transportation mode assigned to the route may not be suitable for expedited shipments.
Solution:
Review Route and Lane Definitions:
- Check the configuration of the route for the product in question. Ensure that the transportation time is correctly defined and matches the expected delivery times for expedited shipments.
- Compare the route's transportation time with the lane's transportation time to identify discrepancies.
Adjust Route or Lane:
- If the route is indeed slower, consider adjusting the route to reduce the transportation time or re-evaluating the lane definition to ensure it reflects the correct expedited shipping times.
Update Master Data:
- Ensure that all relevant master data (product, route, transportation lanes) is up to date and accurately reflects the current logistics capabilities.
Check Planning Parameters:
- Review the planning parameters for the product and ensure they are set correctly to allow for expedited shipments.
Consult Documentation:
- Refer to SAP documentation or help resources for specific guidance on configuring routes and lanes in APO.
Testing:
- After making adjustments, run a test scenario to ensure that the error does not reoccur and that the planning process works as expected.
Related Information:
/SAPAPO/ROUTE
to manage routes or /SAPAPO/LANE
for lanes.By addressing the discrepancies between the route and lane definitions, you should be able to resolve the error and ensure that your transportation planning aligns with the expedited shipping requirements.
Get instant SAP help. Start your 7-day free trial now.
/SAPAPO/DEPL_MESS018
Route slower than lane (product &1 from &2 to &3, normal shipment)
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
/SAPAPO/DEPL_MESS017
Sub BOD for location product &1 &2 cannot be planned (TPOP)
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
/SAPAPO/DEPL_MESS020
Scheduler returned route information for no scheduling activity
What causes this issue? The SPP scheduler was called for a scheduling scenario which should include scheduling according to routes. The scheduling re...
/SAPAPO/DEPL_MESS021
Scheduler returned route information for multiple scheduling activities
What causes this issue? The SPP scheduler was called for a scheduling scenario which should include a scheduling according to routes. The scheduling ...
Click on this link to search all SAP messages.