How To Fix /SAPAPO/CURTO_UI089 - Overlapping operation does not have a successor activity of type P


/SAPAPO/CURTO_UI089 - Overview

  • Message type: E = Error

  • Message class: /SAPAPO/CURTO_UI -

  • Message number: 089

  • Message text: Overlapping operation does not have a successor activity of type P

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message /SAPAPO/CURTO_UI089 - Overlapping operation does not have a successor activity of type P ?
    The SAP error message /SAPAPO/CURTO_UI089 indicates that there is an issue with overlapping operations in the Advanced Planning and Optimization (APO) module. Specifically, it suggests that an operation is overlapping with another operation, but it does not have a successor activity of type "P" (which typically stands for "Production" or "Process").
    
    Cause: Overlapping Operations: The error occurs when two or more operations are scheduled to occur at the same time, and the system expects a successor operation of type "P" to follow the overlapping operation. Incorrect Planning Data: The planning data for the operations may be incorrectly defined, leading to conflicts in scheduling. Missing Successor: The operation that is overlapping may not have a defined successor operation that is of the required type.
    Solution: Check Operation Scheduling: Review the operations in the planning board or the relevant transaction to identify any overlapping operations. Ensure that the operations are scheduled correctly without overlaps unless intended. Define Successor Operations:

    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
The AI Support Assistant is great. It provides comprehensive assistance even on the most difficult issues. I highly recommend this service.
Rate 1
John Jordan
SAP Consultant & Author