How To Fix /SAPAPO/CURTO_PPE065 - Secondary Resource &1 at mode &1 of activity &2 is invalid


SAP Error Message - Details

  • Message type: E = Error

  • Message class: /SAPAPO/CURTO_PPE -

  • Message number: 065

  • Message text: Secondary Resource &1 at mode &1 of activity &2 is invalid

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message /SAPAPO/CURTO_PPE065 - Secondary Resource &1 at mode &1 of activity &2 is invalid ?

    The SAP error message /SAPAPO/CURTO_PPE065 indicates that there is an issue with a secondary resource in the context of a production planning or scheduling activity in SAP Advanced Planning and Optimization (APO). This error typically arises when the system cannot find a valid secondary resource for a specific mode of an activity.

    Cause:

    1. Invalid Resource Configuration: The secondary resource specified may not be correctly configured in the system. This could be due to missing or incorrect settings in the resource master data.
    2. Resource Not Assigned: The secondary resource may not be assigned to the activity or mode in question.
    3. Inactive Resource: The secondary resource might be inactive or not available for the specified time period.
    4. Data Inconsistency: There could be inconsistencies in the data related to the resource, such as incorrect planning versions or missing entries in the resource planning table.

    Solution:

    1. Check Resource Configuration:

      • Go to the resource master data and verify that the secondary resource is correctly defined and active.
      • Ensure that the resource is assigned to the correct activity and mode.
    2. Validate Activity Settings:

      • Check the activity settings in the production planning or scheduling environment to ensure that the secondary resource is properly linked to the activity.
      • Make sure that the mode of the activity is correctly defined and that the secondary resource is valid for that mode.
    3. Review Resource Availability:

      • Check the availability of the secondary resource for the required time period. Ensure that it is not blocked or scheduled for maintenance during the planned production time.
    4. Data Consistency Check:

      • Run consistency checks in the APO system to identify any discrepancies in the resource data.
      • If necessary, regenerate the planning data or reassign the resources to ensure that all configurations are up to date.
    5. Consult Documentation:

      • Refer to SAP documentation or help notes related to resource management in APO for additional troubleshooting steps and best practices.

    Related Information:

    • Transaction Codes: You may need to use transaction codes like /SAPAPO/RRP3 (Product View) or /SAPAPO/RES01 (Resource Overview) to analyze resource assignments and configurations.
    • SAP Notes: Check for any relevant SAP Notes that might address known issues or provide patches related to this error message.
    • Support: If the issue persists after checking the above points, consider reaching out to SAP support for further assistance, providing them with detailed information about the error and the context in which it occurs.

    By following these steps, you should be able to identify and resolve the issue related to the /SAPAPO/CURTO_PPE065 error message.

    • Do you have any question about this error?


      Upgrade now to chat with this error.


Instant HelpGet instant SAP help. Start your 7-day free trial now.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo simplifies finding the accurate answers to SAP message errors. I now use every week. A must have tool for anyone working with SAP! Highly recommended!
Rate 1
Kent Bettisworth
Executive SAP Consultant