Message type: E = Error
Message class: /SAPAPO/CURTO_PPE -
Message number: 040
Message text: Routing or line is missing in the production version for the RPM product
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
/SAPAPO/CURTO_PPE040
- Routing or line is missing in the production version for the RPM product ?The SAP error message /SAPAPO/CURTO_PPE040 indicates that there is a missing routing or line in the production version for a specific RPM (Recipe-based Production Management) product. This error typically arises in the context of Advanced Planning and Optimization (APO) when the system is unable to find the necessary routing information to execute production planning or scheduling.
Cause: Missing Routing: The routing for the production version of the product is not defined in the system. Incorrect Production Version: The production version assigned to the product may not have a valid routing associated with it. Data Inconsistency: There may be inconsistencies in the master data, such as the production version not being properly maintained or activated.
Configuration Issues: There could be configuration issues in the APO system that prevent the routing from being recognized.
Solution: Check Production Version: Go to the transaction code C223 (Change Production Version) and verify that the production version for the RPM product is correctly defined. Ensure
Get instant SAP help. Sign up for our Free Essentials Plan.
/SAPAPO/CURTO_PPE039
Internal error: Production version has invalid PDS usage
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
/SAPAPO/CURTO_PPE038
No changes to be made in current Workbench session
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
/SAPAPO/CURTO_PPE041
iPPE object for product could not be written to liveCache
What causes this issue? Some of the generated PDS data must be saved in the liveCache. However, an error occurred when writing these data to the live...
/SAPAPO/CURTO_PPE042
iPPE explosion returns insufficient data for PDS generation &1
What causes this issue? When generating a production data structure (PDS), the iPPE master data for an iPPE access are determined by the iPPE explosi...
Click on this link to search all SAP messages.