How To Fix /SAPAPO/CURTO_API049 - PDS &1, op. &2, activity &3: Resource is not relevant for block planning


SAP Error Message - Details

  • Message type: E = Error

  • Message class: /SAPAPO/CURTO_API -

  • Message number: 049

  • Message text: PDS &1, op. &2, activity &3: Resource is not relevant for block planning

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message /SAPAPO/CURTO_API049 - PDS &1, op. &2, activity &3: Resource is not relevant for block planning ?
    The SAP error message /SAPAPO/CURTO_API049 indicates that there is an issue with the resource configuration in the context of block planning within the SAP Advanced Planning and Optimization (APO) module. Specifically, the error states that the resource in question is not relevant for block planning, which can occur for several reasons.
    
    Cause: Resource Configuration: The resource may not be set up correctly for block planning. This could be due to missing settings or incorrect parameters in the resource master data. Planning Version: The planning version being used may not be configured to include the resource for block planning. Resource Type: The resource type may not support block planning. Certain resource types may not be eligible for block planning based on their configuration. PDS (Process Data Structure): The PDS associated with the resource may not be correctly defined or may not include the necessary settings for block planning.
    Solution: Check Resource Settings: Go to the resource master data in

    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo simplifies finding the accurate answers to SAP message errors. I now use every week. A must have tool for anyone working with SAP! Highly recommended!
Rate 1
Kent Bettisworth
Executive SAP Consultant