How To Fix /SAPAPO/CURTO_API045 - PDS &1, operation &2, activity &3: Overlap maintained incorrectly


SAP Error Message - Details

  • Message type: E = Error

  • Message class: /SAPAPO/CURTO_API -

  • Message number: 045

  • Message text: PDS &1, operation &2, activity &3: Overlap maintained incorrectly

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message /SAPAPO/CURTO_API045 - PDS &1, operation &2, activity &3: Overlap maintained incorrectly ?
    The SAP error message /SAPAPO/CURTO_API045 typically occurs in the context of SAP Advanced Planning and Optimization (APO) when there is an issue with the Product Data Structure (PDS) related to overlapping operations. This error indicates that there is an incorrect overlap in the scheduling of operations within a PDS.
    
    Cause: The error is generally caused by one of the following issues: Incorrect Overlap Definition: The operations defined in the PDS have overlapping time frames that are not allowed. For example, if one operation is scheduled to start before another operation has finished, this can lead to conflicts.
    Configuration Issues: The configuration settings for the operations may not allow for the defined overlap, or the settings may not be correctly defined in the PDS. Data Entry Errors: There may be mistakes in the data entry for the operations, such as incorrect start and end times or durations.
    Solution: To resolve this error, you can take the following steps: Check

    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo's SAP support assistant is amazing. Saves me countless hours trying to solve complex SAP issues myself. It's a real game changer!
Rate 1
Thomas Michael
SAP Consultant, Author & Speaker