How To Fix /SAPAPO/CURTO_API026 - Incorrect value for shift interruption for PDS &1, op. &2, activity &3


SAP Error Message - Details

  • Message type: E = Error

  • Message class: /SAPAPO/CURTO_API -

  • Message number: 026

  • Message text: Incorrect value for shift interruption for PDS &1, op. &2, activity &3

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message /SAPAPO/CURTO_API026 - Incorrect value for shift interruption for PDS &1, op. &2, activity &3 ?
    The SAP error message /SAPAPO/CURTO_API026 indicates that there is an issue with the shift interruption settings in the Production Data Structure (PDS) for a specific operation and activity. This error typically arises in the context of Advanced Planning and Optimization (APO) when the system encounters an invalid or unexpected value for shift interruptions during planning or scheduling processes.
    
    Cause: The error can be caused by several factors, including: Incorrect Shift Interruption Settings: The shift interruption settings for the operation or activity in the PDS may not be configured correctly. This could include invalid values or settings that do not align with the defined work schedule. Inconsistent Data: There may be inconsistencies in the data related to the PDS, such as missing or incorrect definitions for shifts, operations, or activities.
    Configuration Issues: The configuration of the APO system or the specific PDS may not be set up to handle the defined shift interruptions properly. Master Data Issues:

    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo's SAP support assistant is amazing. Saves me countless hours trying to solve complex SAP issues myself. It's a real game changer!
Rate 1
Thomas Michael
SAP Consultant, Author & Speaker