How To Fix /SAPAPO/CURTO812 - Bottleneck ressource &1 used in multiple superordinate operations


/SAPAPO/CURTO812 - Overview

  • Message type: E = Error

  • Message class: /SAPAPO/CURTO -

  • Message number: 812

  • Message text: Bottleneck ressource &1 used in multiple superordinate operations

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message /SAPAPO/CURTO812 - Bottleneck ressource &1 used in multiple superordinate operations ?
    The SAP error message /SAPAPO/CURTO812 indicates that a bottleneck resource is being used in multiple superordinate operations within the Advanced Planning and Optimization (APO) module. This typically occurs in the context of production planning and scheduling, where a resource (like a machine or labor) is over-allocated due to its involvement in multiple operations that require it simultaneously.
    
    Cause: Resource Overlap: The bottleneck resource is scheduled to perform multiple tasks at the same time, which is not feasible. Incorrect Planning: The planning process may not have adequately accounted for the availability of the bottleneck resource.
    Configuration Issues: There may be issues with the configuration of the resource or the operations that are using it. Capacity Constraints: The resource may have limited capacity, and the operations are exceeding this capacity.
    Solution: Review Resource Allocation: Check the scheduling of the operations that are using the bottleneck resource. Ensure that they do not overlap in a way that exceeds the resource's

    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo simplifies finding the accurate answers to SAP message errors. I now use every week. A must have tool for anyone working with SAP! Highly recommended!
Rate 1
Kent Bettisworth
Executive SAP Consultant