How To Fix /SAPAPO/CURTO035 - Explosion of components with date &1


SAP Error Message - Details

  • Message type: E = Error

  • Message class: /SAPAPO/CURTO -

  • Message number: 035

  • Message text: Explosion of components with date &1

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message /SAPAPO/CURTO035 - Explosion of components with date &1 ?

    The SAP error message /SAPAPO/CURTO035 typically occurs in the context of SAP Advanced Planning and Optimization (APO) when there is an issue with the explosion of components in a production or planning scenario. This error message indicates that there is a problem with the component explosion for a specific date, which can be related to various factors such as master data issues, planning parameters, or configuration settings.

    Cause:

    1. Missing Master Data: The components required for the production or planning process may not be defined in the system. This includes missing materials, bills of materials (BOMs), or routing information.
    2. Date Issues: The date specified in the error message may not be valid for the components being exploded. This could be due to the planning horizon being exceeded or the components not being available for that date.
    3. Configuration Issues: There may be configuration settings in the APO system that are not set up correctly, leading to issues in the component explosion process.
    4. Stock Availability: The system may not find sufficient stock for the components required for the production order or planning scenario.
    5. Planning Version: The planning version being used may not have the necessary data or may be locked.

    Solution:

    1. Check Master Data: Ensure that all necessary master data (materials, BOMs, routings) is correctly maintained in the system. Verify that the components are defined and available for the specified date.
    2. Review Planning Parameters: Check the planning parameters and settings in the APO system to ensure they are configured correctly for the component explosion process.
    3. Validate Dates: Confirm that the date specified in the error message is within the valid planning horizon and that the components are available for that date.
    4. Stock Check: Verify the stock levels for the components to ensure that there is enough inventory available for the planned production.
    5. Planning Version: Make sure that the correct planning version is being used and that it is not locked or missing data.
    6. Run Consistency Checks: Use transaction codes like /SAPAPO/TSM or /SAPAPO/CC to run consistency checks on the master data and planning data.

    Related Information:

    • Transaction Codes: Familiarize yourself with relevant transaction codes in SAP APO, such as /SAPAPO/MDP for planning and /SAPAPO/CC for consistency checks.
    • SAP Notes: Check for any relevant SAP Notes that may address specific issues related to this error message.
    • Documentation: Review SAP documentation and help resources for more detailed information on component explosion and planning processes in APO.

    If the issue persists after checking the above points, it may be beneficial to consult with your SAP support team or refer to SAP's support portal for further assistance.

    • Do you have any question about this error?


      Upgrade now to chat with this error.


Instant HelpGet instant SAP help. Start your 7-day free trial now.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo's SAP support assistant is amazing. Saves me countless hours trying to solve complex SAP issues myself. It's a real game changer!
Rate 1
Thomas Michael
SAP Consultant, Author & Speaker