Do you have any question about this error?
Message type: E = Error
Message class: /SAPAPO/CULL1 -
Message number: 806
Message text: No activity selected or no activities exist
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
/SAPAPO/CULL1806
- No activity selected or no activities exist ?The SAP error message
/SAPAPO/CULL1806 No activity selected or no activities exist
typically occurs in the context of SAP Advanced Planning and Optimization (APO) when trying to execute a planning function or transaction that requires specific activities to be selected or available. Here’s a breakdown of the cause, potential solutions, and related information:Cause:
- No Activities Selected: The user may not have selected any activities in the planning book or the relevant transaction.
- No Activities Exist: There may be no activities defined for the selected planning object or the planning book being used.
- Data Issues: There could be issues with the data in the system, such as missing or incomplete activity definitions.
- Authorization Issues: The user may not have the necessary authorizations to view or select the activities.
Solutions:
- Select Activities: Ensure that you have selected the appropriate activities in the planning book or transaction. Check the selection criteria and make sure they are correctly set.
- Check Activity Definitions: Verify that the activities you are trying to access are defined in the system. You can do this by checking the relevant planning area or master data.
- Review Planning Book Settings: Ensure that the planning book is correctly configured to display the activities you need. You may need to adjust the settings or layout of the planning book.
- Data Consistency Check: Run consistency checks on the master data and planning data to ensure that all necessary data is available and correctly set up.
- Authorization Check: Confirm that you have the necessary authorizations to access the activities. If not, contact your system administrator to obtain the required permissions.
- Consult Documentation: Refer to SAP documentation or help resources for specific guidance related to the planning function you are trying to execute.
Related Information:
/SAPAPO/SDP94
for planning book access.By following these steps, you should be able to diagnose and resolve the error message /SAPAPO/CULL1806 No activity selected or no activities exist
. If the problem persists, consider reaching out to your SAP support team for further assistance.
Get instant SAP help. Start your 7-day free trial now.
/SAPAPO/CULL1801
Header data of iPPE for unique ID &1 not found
What causes this issue? The system could not determine any iPPE access objects when exploding a PP/DS production data structure with reference to an ...
/SAPAPO/CULL1800
Unknown error occurred when exploding the PP/DS production data structure
What causes this issue? A previously unknown error occurred during the explosion of the PP/DS production data structure.System Response The system c...
/SAPAPO/CULL1807
The activity (actid = &1) for a sequence group does not exist
What causes this issue? The system determined an inconsistency between the activities and the sequence structure when generating a PP/DS production d...
/SAPAPO/CULL1808
The activity (actid = &1) for a sequence does not exist
What causes this issue? The system determined an inconsistency between the activities and the sequence structure when generating a PP/DS production d...
Click on this link to search all SAP messages.