Do you have any question about this error?
Message type: E = Error
Message class: /SAPAPO/CULL1 -
Message number: 072
Message text: Explosion date &1
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
/SAPAPO/CULL1072
- Explosion date &1 ?The SAP error message
/SAPAPO/CULL1072 Explosion date &1
typically occurs in the context of Advanced Planning and Optimization (APO) when there is an issue related to the explosion of a bill of materials (BOM) or a production order. This error indicates that the explosion date specified is not valid or cannot be processed for the given context.Cause:
- Invalid Explosion Date: The explosion date provided may be in the past or not aligned with the planning horizon.
- Missing Master Data: Required master data (like BOM, routing, or production version) may be missing or not properly configured for the specified date.
- Planning Version Issues: The planning version being used may not be set up correctly or may not have the necessary data for the explosion date.
- Time Period Restrictions: There may be restrictions on the time periods for which planning is allowed, leading to the explosion date being outside of these limits.
Solution:
- Check the Explosion Date: Ensure that the explosion date is valid and falls within the acceptable planning horizon. Adjust the date if necessary.
- Verify Master Data: Check that all relevant master data (BOM, routing, production versions) is correctly set up and available for the specified date.
- Review Planning Version: Ensure that the planning version being used is correctly configured and contains the necessary data for the explosion date.
- Adjust Planning Parameters: If there are restrictions on planning periods, consider adjusting these parameters to allow for the desired explosion date.
- Consult Documentation: Refer to SAP documentation or help resources for specific details related to the error message and its context.
Related Information:
/SAPAPO/CC01
(for creating or changing a characteristic) or /SAPAPO/MDP1
(for planning version settings) to investigate further.By following these steps, you should be able to identify the root cause of the error and implement a suitable solution.
Get instant SAP help. Start your 7-day free trial now.
/SAPAPO/CULL1071
PDS explosion for product &1, location &2, source &3
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
/SAPAPO/CULL1070
PDS explosion
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
/SAPAPO/CULL1073
Date-independent explosion
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
/SAPAPO/CULL1074
Explosion quantity &1
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
Click on this link to search all SAP messages.