Do you have any question about this error?
Message type: E = Error
Message class: /SAPAPO/CULL1 -
Message number: 020
Message text: PP/DS production data structure loaded successfully
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
/SAPAPO/CULL1020
- PP/DS production data structure loaded successfully ?The SAP error message
/SAPAPO/CULL1020
indicates that the PP/DS (Production Planning/Detailed Scheduling) production data structure has been loaded successfully. This message is not an error in the traditional sense; rather, it is an informational message indicating that the data load process for the production data structure has completed without issues.Cause:
Since this message is informational and indicates a successful operation, there is no action required to resolve an error. However, if you are looking to ensure that the data is being processed correctly, you can take the following steps:
Verify Data Integrity: Check the loaded data to ensure that it meets your expectations and requirements. You can do this by reviewing the relevant planning books or data views in SAP APO.
Monitor Subsequent Processes: After the data load, monitor any subsequent planning or scheduling processes to ensure they are functioning as expected.
Check Logs: If you are experiencing issues elsewhere in the system, check the logs for any related messages or warnings that might indicate a problem.
Consult Documentation: Review SAP documentation or notes related to PP/DS data loading for any specific considerations or best practices.
/SAPAPO/OM17
for monitoring the data transfer process.In summary, the message /SAPAPO/CULL1020
is a positive indication of successful data loading, and no corrective action is needed unless you encounter issues in subsequent processes.
Get instant SAP help. Start your 7-day free trial now.
/SAPAPO/CULL1019
No configuration for configurable PP/DS PDS &1 &2 &3
What causes this issue? The system attempted to explode a configurable PP/DS production data structure for material &V1& in location &V2&...
/SAPAPO/CULL1018
Error during reporting point structure generation
What causes this issue? Generation of the reporting point structure was terminated by an error.System Response The system cancels generation of the ...
/SAPAPO/CULL1021
Unknown type &1 from Bitmap
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
/SAPAPO/CULL1022
No authorization to delete &1
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
Click on this link to search all SAP messages.